Sunday, June 17, 2018

Keep ducking on....

More ducting.. it's quite repetitive this house building lark.  Ducting is all in under the crawl space, so now it is being put in all through the house...



For my English readers....we are installing forced air heating.  The ducting carries the hot/cold air around the house and it is blown out into the rooms via vents (register boots) in the floor....


Once all (or most) of the ducting is installed you then have to fit the air handler - I suspect that handles the air!  You take it apart and turn it upside down and put everything back in....

The evaporator.....


And then you put the front back on and lift it into place....

And there you have it.  So onto a quick garden update, picked and ate my first raspberry - DELICIOUS..... Mr. M can have the next one....

Red currants are doing their thang and going red....

My flower bed is starting to bloom...


They are in competition with my sweet Williams that are storming ahead in the pretty stakes..

Mind you they've got some competition in our back porch.  My Christmas cactus and another currently unnamed spurious Ikea cactus are also in flower...





Veggies are growing well, beans, zucchinis and nasturtiums, with potatoes behind them...

Please, peace, peas....

Parsnips with a bald spot....

Greenhouse is coming along...

Won't be long Brian.....

Sunday, June 10, 2018

Getting all ducked up.....

It's been a much more productive week.... firstly the dormers all got some more house wrap treatment, and then fitted with their window surrounds.  Only thing left to do the dormers is to fit the shingles...



The Mr. M took the decision to move away from the remaining window surrounds and start working on the ducting for his heating system.  He was getting a bit burnt out on window trim and endless layers of paint.  So last week he had put this together...

This week it's been all systems go... The above box sits in the utility cupboard and has the air handler on top of it, this being the inside portion of the heat pump.

You cut a hole in your floor...

Stick lots of metal boxes together...

Stuck together with some sticky paste......

Turn it upside down and drop it through the floor and down into the crawl space...

You lay all your ducting out up top....

Stick it together in manageable lengths and then you head down into the crawl space and put it all together....



Exciting stuff.... next week he will be cracking on with more and hopefully get it mostly finished.  Then who knows what is next!!

Sunday, June 3, 2018

Work hard, stay bumble.....

Well where to start... ummm here.  So in the past two weeks the windows have had a spot of trim added to the top, metal no less...


And he fitted the window trim to the final downstairs window....

Annnnnnnnnnnnnnnnnd finally he built this, seriously crying with laughter when I asked Mr. M what he had to go on the blog...



In his defense he has been experiencing back twinges reminiscent of his slipped disc, so not wanting to do any long term damage he's been on enforced rest.  So what did he do with his free time.  We had a long weekend and the rest of the week was spent running errands and then...

Some of this....
 
Some of this


And lots of this....

On the flip side of the household, there's been lots of activity, everything in the garden is starting to grow, grow, grow. My Sweet Williams are in full bloom....

and my dahlias and scatter seeds are about to break out into song color...


Everything else is starting to get going,beans zuchinnis....
 
Greenhouse tomatoes, getting some flowers...


Potatoes at the top of their bins..

Garlic bed is looking good

My parsnip germination was much better this year, but for some reason the middle of the bed is a no go area, not sure what this is about...
 

And finally my raspberry bed is looking promising, these came with us from Seattle and after three years looks like they are back up to speed....
FULL of bees.....

Me and the bees will keep the wheels turning, Mr. M will hopefully catch up with us soon.....